HomeCategory

Latest News - Syscom Automation - Page 2

https://syscomme.com/wp-content/uploads/2025/08/syscom-enhances-water-infrastructure-with-scada-upgrade-960x640.jpg

SYSCOM has completed the removal of an existing mimic panel and the installation of a new Station Controller and #SCADA Server Panel for a key water infrastructure project in the UAE. This achievement reflects our unwavering commitment to delivering advanced automation solutions tailored to critical infrastructure needs. With expertise across the full project lifecycle—design, engineering,...

https://syscomme.com/wp-content/uploads/2025/08/driving-innovation-in-industrial-automation-plc-scada-commissioning-at-a-major-uae-pumping-station-960x640.jpg

Our team at SYSCOM is executing critical PLC/SCADA Commissioning works at one of the UAE’s major pumping stations—demonstrating our commitment to precision, reliability, and innovation in industrial automation. We are pioneers in delivering value-added automation solutions across both IT and OT landscapes, including: Cybersecurity & Disaster Recovery Augmented Reality & Change Management Systems Version Management...

https://syscomme.com/wp-content/uploads/2025/08/transforming-water-infrastructure-through-advanced-plc-solutions-960x640.jpg

SYSCOM is proud to be at the forefront of EPC works for a major water management system, focused on upgrading existing plants and integrating them into the Main #SCADA network for real-time monitoring and fully automated operations. As part of this project, our experts are currently executing Cybersecurity Panel installation and commissioning, ensuring robust protection...

https://syscomme.com/wp-content/uploads/2025/08/high-performance-control-systems-for-water-utility-infrastructure-960x640.jpg

At SYSCOM, we take pride in engineering high-performance automation systems that drive operational efficiency and control in complex utility environments. We are currently working on a key project involving the automation of well operations, distribution pipelines, valves, and pumping systems—a critical backbone for a major water #infrastructure client in the Middle East. Our engineering team...

https://syscomme.com/wp-content/uploads/2025/08/automation-scada-commissioning-for-large-scale-reservoir-project-960x640.jpg

Syscom is proud to announce the successful commissioning phase of a major #Greenfield development — a fully automated 30 Million Imperial Gallon (MIG) reservoir plant, designed to strengthen the region’s water infrastructure. This advanced facility is now integrated with the main water transmission network, enabling seamless remote operations and control via a centralized SCADA system....

https://syscomme.com/wp-content/uploads/2025/07/commissioning-of-major-pumping-station-in-abu-dhabi-960x640.jpg

Another milestone achieved by Syscom – the UAE’s trusted name in Industrial & PLC Automation! We’re proud to announce the successful commissioning of a Major Pumping Station in Abu Dhabi, delivered with precision and technical excellence. From Engineering & Design to Panel Manufacturing, SCADA Integration, On-site Installation & Commissioning, and ongoing Maintenance/AMC – we provided...

https://syscomme.com/wp-content/uploads/2025/07/fat-ready-plc-control-panels-for-zmc-modular-cooling-plant-1-960x640.jpg

We’re proud to share the latest progress on our ongoing automation project. Our team has completed the design, engineering, programming, and assembly of a Redundant Allen Bradley PLC Control System, built to manage primary side instrumentation with precision and reliability. The control panels are now fully assembled and ready for Factory Acceptance Testing (FAT) —...

https://syscomme.com/wp-content/uploads/2025/07/fat-in-progress-for-major-uae-pumping-station-scada-upgrade-960x640.png

Factory Acceptance Testing (FAT) is in full swing for a major pumping station upgrade in the UAE! This project aims to modernize existing plants and seamlessly integrate them with the main #SCADA system, enabling full automation and real-time monitoring. By transitioning to auto mode, we ensure greater efficiency, reliability, and smarter water management, driving progress...

https://syscomme.com/wp-content/uploads/2025/07/epc-works-for-major-water-management-system-960x640.jpg

We are pleased to announce the successful completion of the Factory Acceptance Test (FAT) for one of our key #EPC projects in the UAE’s water management sector. The commissioning phase is currently underway, marking another step toward achieving operational excellence and sustainable infrastructure development. Our expert engineering team continues to deliver turnkey #electrical solutions for...