
Project Introduction:
The scope of this project was to design control system for AL-ZAHIA MALL in Sharjah – UAE which will automatically control the Sewage Treatment and RO plant process. This Plant is designed to treat an initial flow of 1,100 m3 /day of raw sewage extendable for future flow of 1,300 m3 /day
The SCADA system monitors and controls the pumping station through a dedicated Programmable Logic Controller (PLC) setup and I/O modules that communicate with field devices and equipment
System Design:
The Control system comprises of Hot Redundant PLC System & SCADA Operator Workstations with its CPUs, Power Supplies, I/O Cards, Ethernet switch, DC power supply for field interrogation, interface relays, terminals etc. housed inside the control panel
The Control System Solution addresses the challenge of short-term and long-term operation planning by providing tools for load scheduling, performance monitoring, performance optimization, network management, water management, pressure management, simulation, vibration monitoring and pump efficiency