Project Introduction:
The scope of this Project is the Design, Supply, Installation, Testing and Commissioning of Electromechanical Works, SCADA and Instrumentation works for 4.5 MIGD Pumping Stations Complete with 1 MIG GRP Water Tank at MBR Solar Park Phase 1 and 3 MIGD Pumping station at Phase 2
System Design:
The Control system comprises of Hot Redundant PLC System & SCADA Operator Workstations with its CPUs, Power Supplies, I/O Cards, Ethernet switch, DC power supply for field interrogation, interface relays, terminals etc. housed inside the control panel
The Control System Solution addresses the challenge of short-term and long-term operation planning by providing tools for load scheduling, performance monitoring, performance optimization, network management, water management, pressure management, simulation, vibration monitoring and pump efficiency